Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Abdul Shukor, S (2013) A geometrical-based approach to recognise structure of complex interiors, Unpublished PhD Thesis, Warwick Manufacturing Group, University of Warwick.

Attwell, D N (1989) Bayesian models for sequential bidding and related theoretical topics, Unpublished PhD Thesis, Department of Statistics, University of Warwick.

Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice, Unpublished PhD Thesis, Warwick Manufacturing Group, University of Warwick.

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained, Unpublished PhD Thesis, Department of Engineering, University of Warwick.

Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary, Unpublished PhD Thesis, Department of Engineering, University of Warwick.

  • Type: Thesis
  • Keywords: building industry; business process re-engineering; change management; feedback; manufacturing; policy; quality management; service quality; total quality management; UK
  • ISBN/ISSN:
  • URL: http://wrap.warwick.ac.uk/3972/
  • Abstract:
    The UK house-building industry is increasingly criticised for the quality of its products. Its business drivers are less focused on the needs of customers compared with much of the manufacturing sector. Recent surveys have revealed considerable dissatisfaction among buyers of newly built homes, particularly with the finished product and after-sales service quality. However, this cannot be viewed in isolation from the general business culture that prevails. In light of increasing calls for industry-wide changes, this research uses Westbury Homes as a typical example to examine existing practices in the industry that act as barriers to a change in culture. In determining a way forward, a review of extant change management models including Total Quality Management, Business Process Re-engineering, Balanced Scorecard and Hoshin Kanri provides new insight into the relative strengths of each and the role they can play in the formation of a holistic approach to successful customer-focused culture change. A four stage Strategy Deployment Maturity Journey for culture change is proffered that guides the deployment of policy through the introduction of i) a balanced set of headline performance measures, ii) operational performance indicators as drivers for change, iii) a participative programme for change, and iv) mechanisms for development, feedback and review of strategy. Early results indicate that implementation will lead to successful deployment of long-term objectives; specifically, a customer-focused culture that views service and product quality as contributing to future sales and profitability, instead of simply in terms of costs.

Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary, Unpublished PhD Thesis, Department of Engineering, University of Warwick.

Druker, J (1980) One big union? Structural change in building trade unionism, Unpublished PhD Thesis, School of Industrial and Business Studies, University of Warwick.

Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990, Unpublished PhD Thesis, Department of Industrial Relations and Organisational Behaviour, University of Warwick.

Mahdad, S (2015) Achieving design quality in building projects: An evolving understanding of critical success factors and stakeholder attributes, Unpublished PhD Thesis, Warwick Manufacturing Group, University of Warwick.

Nikolov, A (2022) Exploring pathways for improving the supply chain integration of infrastructure projects, Unpublished PhD Thesis, , University of Warwick.

Wu, H-C (2007) Business failure prediction model for the construction industry using financial ratios and entropy measures with discriminant analysis, Unpublished PhD Thesis, Warwick Manufacturing Group, University of Warwick.